EV charging installation service for apartmentsSERVICE FOR PHV MANSION

Suggested by experience and results

What kind of charger should I install and where to go to the apartment that lives in now?
Are you not worried about any construction costs? In such cases, please contact us.
Our company has a track record as a recommended contractor appointed by Nissan Motor, as well as
As it is a 100% subsidiary of Maeda Construction Industry Co., Ltd., you can consult with confidence.

About "Installation study support service"

Our "Installation study support service" is a charger that can be installed in homes for sale,
It is a service (for a fee) that comprehensively proposes the installation location, the rough estimate of the construction cost, the method of bearing the construction cost, and the operation method after the installation.
The contents of the proposal will be shown in a concrete form by drawings.

01 "Estimate" of the final installation plan

It is an "estimate" that is easy to distinguish from labor costs and material costs, and is suitable for grant applications.

02 Installation layout (plan view)

It is a drawing that shows the positional relationship between the charger installation location and the power reception location in an easy-to-understand manner.

03 Electrical System Diagram

The drawings showing wiring paths and wiring specifications can also be useful for future expansion.

04 completion forecast

It shows three-dimensionally the charger installation location and its surroundings. It is a top priority technology that utilizes photographic measurement technology.

JM will also consult on the use of subsidies in the country.

Charge facilities are 1/2 (V2H is 2/3), and construction is paid by fixed amount about contents that country regulates in the Heisei 31 fiscal year.
This grant will only be paid if the application passes the national review and is adopted.
JM proposes a plan to make the best use of this grant.
The details of the grant[Next-generation car reconstruction center]Please see

Method of consultation, flow of application

Please apply from our website.
Application is limited to representatives of the management union (Chairman etc.), but it does not matter whether the union has legal personality or not.
In addition, we are limited to application for management association of condominiums located in Hokkaido, Tokyo, Kanagawa Prefecture, Saitama Prefecture, Chiba Prefecture, Chiba Prefecture, Aichi Prefecture, Osaka Prefecture, Hyogo Prefecture, Fukuoka Prefecture.
In principle, suggestions and exchange of opinions will be conducted by dedicated email.

Method of consultation, flow of application

Service implementation period / fee

Service implementation period / fee

Basic schedule of service
(In the case of subsidy utilization, the application for public offering and grant must be completed by September 30)

Basic schedule of service

JM system

JM boasts a construction network that covers the whole country.

JM system
JM system

Installation example of charger

  • Stand type ordinary charger

  • 200V outlet (wall installation example)

  • EV power station

FAQ

Do you have charging facilities in my apartment?

It is possible to consider if there is an agreement on 3/4 of the electricity, space that can be recharged, and residents required for charging.
For more information, please consult with the management union and consider using our support service.

Why is it difficult to install a charger in an apartment?

The reason is that there are not many cases where electricity is necessary for charging, and consensus building on the installation (necessitating 3/4 of all households) is necessary.

Are there any chargers compatible with all electric vehicles and PHV(plug-in hybrid vehicles)?

There is. It is an outlet and what is usually called a charger. However, cars manufactured by Tesla in the US are excluded because they require a dedicated charger.

Please tell me the rough estimate of the construction cost.

As construction contents differ according to distance from charger to install, distance from receiving facility to place to install charger, expense depends on construction contents.
In the case of attaching an outlet, wiring from the power receiving facility to the outlet is required to be about 20 m, and it is about 500,000 yen when the construction is carried out by the method called exposed piping.

Do you have any subsidies?

There are subsidies from the country. Next-generation car center (Web)home pagePlease Confirm. Your local government may be giving assistance. Ask your local authorities.

How can I apply for JM's apartment support service?

Please apply from HP. We also accept inquiries by phone.

How Much does JM's Condominium Support Service Cost?

It is 104,500 yen (tax included). Construction fee is not included. After the final draft is decided, payment will be made when the drawings etc. are delivered.
In addition, this expense is "target of assistance". The application adopted by the General Assembly and decided to be established is subject to the application adopted by the country.

Can you participate in holding a briefing session for the residents?

Basically, it will be handled by e-mail, but we will participate in the board meeting of the final draft decision before the general meeting.

Although the apartment locations available for application are limited to nine prefectures in the explanatory text of "Method of consultation / flow of application", can you apply from other locations?

We are sorry, but we are limited to application from apartment located in these nine prefectures.

Matters to be noted

  • We will properly manage personal information received at the time of application and after, based on our "Personal Information Protection Policy" (separately listed).
  • We will propose possible installation plans for us, but the final decision on adoption will be the responsibility of the management union (Chairman).
  • As a result of having the application received and surveying the power receiving environment, it may be difficult to install.
  • The contract with us will be resolved by the board of directors and will be made in the name of the representative.
  • If approval is not obtained at the management union general meeting, it can not be established.
  • In addition, even if you adopt our proposal, there is no guarantee that it will be adopted (adopted) by the management union general meeting.
  • Actual construction costs may be high compared to the initial estimate depending on the current land conditions.
  • Construction may be signed with another company. At that time, we do not accept any changes, etc. at our expense of the delivered drawings.
  • We do not cope with subsidy application work when construction is contracted with other companies.
  • National grants are determined by adoption, so it is not always possible to obtain the full amount.
    Also, the amount of benefit may be different from our estimate. We do not bear the difference, etc.
  • It is the responsibility of the management union to implement changes to the “management agreement” pertaining to the installation, and the “use bylaws” pertaining to use, etc. (Not for service)
  • Please do the duties such as the collection of the "electric charge" concerning the use of the charger at the management union's responsibility.
  • The various services provided by us include those that refuse to provide information to third parties.

Charging equipment installation application system Maintenance notice

System maintenance will be carried out on the following dates and times.
"Saturday, April 24, 9: 00-18: 00"
You cannot apply for a quote during the maintenance period. Thank you for your understanding.

Click here for maintenance details