Corresponding model

e-208 / e-2008 / 308 HYBRID / 308 SW HYBRID / 3008 HYBRID4 / 508 HYBRID / 508 SW HYBRID / 408 HYBRID

長期製品保証サービスについて

Four reasons to choose

From peugeot
Recommended installation company

Our company is the only one recommended charging facility in Japan market.

The installation result is No.1 in Japan※1
Nationwide correspondence is possible※2

We promise reliable construction based on the installation experience of more than 40,000 items.

※ 1 Research by our company
※ 2 Excluding remote islands

24 hours 365 days
Safety support and long term construction guarantee

After service after-sales service, our call center will receive 24 hours 365 days. The construction guarantee is also safe with 5 years. (Partial construction)

Customer information
Thorough management and advanced care

Important customer information will be strictly managed with electronic data based on the personal information protection policy.

Product Line

Charging with in-vehicle cable

EV · PH EV Outdoor outlet for charging
(Manufactured by Panasonic Corporation, rated output 3 kW)

EV · PH EV charging receptacle featuring high operability and long life design that allows plug insertion / removal with one hand.

Basic construction price

104,500Circle(Including charging equipment, tax included)

Charging with cable of charging equipment

ELSE EV hekia S Mode3 * 1 <ELSE EV hekia S Mode3>
(Made by Panasonic)

The miniaturization increases the degree of freedom of installation. Charging in 6kW enables charging in a short time.

Standard construction price
6kW standard specifications
385,000Circle(Including charging equipment, tax included)
3kW standard specifications
310,200Circle(Including charging equipment, tax included)



【HPよりお申込みのお客様限定!製品延長保証(最大5年)】

★戸建てのお客様で、1敷地に付き1台を5年保証します!(メーカー保証1年を含みます)
 その他条件についてはページ上部「長期製品保証サービスについて」チラシをご確認下さい

  • * 1 Mode 3: This is the charging facility that can be charged with the charging cable equipped in the main unit.

Contents of standard construction

* Contents of construction that is outside the standard
As a result of installation site survey, there are cases where it is necessary to change the contract capacity of electricity, additional wiring work and laying ground wire etc are required by the house. In that case, a separate expense will be incurred.

About additional costs

If the following work is required as a result of the installation location survey, a separate fee will be charged.

*The amount may vary depending on the condition of the house

Work content cost(tax included)

Contract change application

Expenses for which our company will perform the application procedure when changing the contracted capacity of electricity

16,500

Replacing the main line

Cost of changing the main line when changing the contracted capacity of electricity

Less than 10m

49,500

10m or more

66,000

Replacing the main switch

The cost of replacing the ELB when changing the contracted capacity of electricity

40A-60A

27,500

75A-100A

38,500

Replacing the distribution board

Change from single-phase two-wire system to single-phase three-wire system

38,500

Additional wiring

Work every 1m beyond 10m

CV-VVR
2.6mm ・ 5.5sq

1,210

CV 8sq

1,650

CV 14sq

2,970

Buried pipe

Construction cost per 1m

1,980

Laying the earth wire

Cost of grounding to another place when the distribution board does not have a ground terminal

6,050

Wall penetration

① The cost of penetrating the wall hole for a special wall
Example) In case of reinforced concrete construction
② X-ray survey cost

12,100

165,000

Installation of SW at hand

Countermeasures against power theft of outlets

14,300

Flow from application to installation

  • STEP 1 Application form input
  • STEP 2 Installation location survey
    Schedule adjustment
  • STEP 3 Site survey
  • STEP 4 Placing an order
    ※1
  • STEP 5 Schedule adjustment
  • STEP 6 Installation
  • STEP 7 Payment※2

※ 1 We will place orders for installation from the URL that arrives at your email address.
※2 現金でのお支払いはお受けしかねます。設置完了後7日以内に銀行振込にてお支払いをお願いいたします。銀行振込以外のお支払方法をご希望の場合は、経営マネジメント本部(03-5276-5239)までお問い合わせください。
Personal information to be stated in the application and required documents, and furthermore, the data of shooting taken by us for the confirmation and management of work execution and work quality etc,Privacy policyWe will manage it appropriately based on.

How to apply

Sales store

Brochure handover · explanation

I will explain about delivery and installation of the pamphlet at the store.

Customer

Survey of installation location from the Web
Application

Installation place Survey applicationApplication formThank you.

About payment method

You can choose from three payment methods. Credit payment is also available with JM installation.

  • Transfer
    Please transfer within 7 days to the designated account described in the invoice. The transfer fee will be borne by the customer.
  • pay by a credit card
    • Credit payments can only be made to the credit card of the person who received the installation contract.
    • The following credit cards can be used.
  • Shopping credit
    • It is available only to the person who received the installation contract. (Not under the age of 20)
    • Corporate customers are not available.
    • Please place an order after the screening of the credit company.
    • Shopping credit is a contract with "Cedina Co., Ltd." that we have a contract with a member store.
    • How much is the interest and number of payments for shopping credits?Hereplease look at

After-sales service
We will receive it at the call center

JM Call Center
( EV only)
0120-81-7048(24時間365日)

When inquiring, it is stuck in the distribution boardAfter-sales service stickerMentioned inPlease give me a 9 digit construction number
We will check the customer's installation history and respond promptly.

※ From 9 o'clock to 18 o'clock inquiries. From 18 o'clock to 9 o'clock the reception will be accepted only for after-sales service.

After-sales service sticker

FAQ

How do I apply for installation?

Please apply from "Application for installation work here" at the bottom of this page.

Can we apply even if it is installed other than a detached house, such as a corporate office?

You can apply. However, the installation basic construction price in this pamphlet is not applicable.
Estimate according to the results of installation site survey.

I currently live in a condominium. Please tell me how to install the charger

Management associations need to resolve the installation. First of all, please consult the management association.
In addition, we offer "installation review support service" (fee) to support management associations who are considering setting up. We will investigate the installation plan appropriate for each condominium, estimate, make drawings and so on. Consultation is free. You can apply from our website.

Is the estimate free?

Estimates are free if you apply for installation in a detached house during a vehicle negotiation with a sales company or after a vehicle contract.
Estimates other than the above are charged.

How do you decide the schedule for site survey and installation?

Our website (https://www.matabee.com/), We will call you from our staff and ask the customer's convenience, we will schedule the schedule.

How long will it take from application to installation completion?

Approximately two to three weeks of time will be taken from the time you accept the application until the installation is completed.
However, depending on survey results, or when changing contract capacity of electricity, more time may be required.

What is the time required for installation site survey and installation?

Approximately 1 to 2 hours for installation site survey, about 4 hours 30 minutes to installation about 6 hours 30 minutes is required.
Please stay at home while setting up.

Click here to apply for a quote

Specifications, prices, designs, and service contents are subject to change without notice.