Target vehicle type

Honda e

EV With power station

Electric car as a power source of home

EV In addition to charging to EV Makes it available as a storage battery EV Power station.
Usually at night when electricity bill is cheap EV Because the electricity in the daytime high electricity bill EV You can live an economical life that uses the stored electricity at home.
Households with solar power facilities can make for a more economical and rational life.
If a power failure occurs, EV As it is possible to use electricity of at home, it is safe.
in this way EV Maximize the value of EV Please consider the installation of "Power Station".

EV About Power Station

EV Power station(Photo: Premium model)

Manufacturer's suggested retail price

charging capacity

Normal power supply capability

Power supply capacity during blackout

Power outage photovoltaic power generation equipment
supply from

cable length

Salt resistant specification

Manufacturer's warranty*

Remote control operation

premium model
(VCG-666CN7)

Premium model for remote islands of Okinawa
(VCG-666CN7)

Standard model
(VCG663CN3)

Wi-Fi specifications

987,800 yen(tax included)

LAN specifications

991,100 yen(tax included)

Wi-Fi specifications

998,800 yen(tax included)

LAN specifications

1,002,100 yen(tax included)

3.7m cable

547,800 yen(tax included)

7.5m cable

602,800 yen(tax included)

less than 6kW

less than 6kW

Less than 6kW (100V/200V output)

Less than 3kW (100V output)

×

7.5m

3.7m cable

3.7m

7.5m cable

7.5m

×

5 years

1 year

2 years

×

※ The 5-year warranty for premium models and the 2-year warranty for standard models need to be agreed upon prior confirmation and the installation completion report.

* A separate timed shipping fee (22,000 yen) will be charged by Nichicon Co., Ltd.

* For product detailsNichicon Corporation websitePlease confirm

Installation outline

*EV The length of the power station charging cable is 7.5m for the premium model and 3.7m for the standard model.
For the standard model, 7.5m can be selected as a manufacturer-installed option.

※ As a result of the installation location survey, work related to the change of the contract capacity of electricity, additional wiring work, laying of grounding wire, etc. may be required.
In that case, additional costs will occur. (For details, please refer to "Additional cost")

About setting

01Application

01Application

Please apply after describing the prescribed content from our website.
Web環境にないお客様につきましては弊社コールセンター(0120-81-7048)までお電話にてお問い合わせください。

02Survey of installation location (home, etc.)/ Time required: about 4 hours

02Survey of installation location (home, etc.)/ Time required: about 4 hours

  • ご自宅等の現在の契約電力容量を確認し、充電設備の設置に支障がないことを確認します。�契約容量の変更についてはお気軽にご相談ください。
    Note: It is the customer's responsibility to change the contracted electricity capacity.
  • EV We will investigate the wiring route including the circuit that is powered from the power station.
  • Determine the installation location of the EV power station itself, such as a parking space.

03Send quote/ Number of days required: On the day of the principle survey

03Send quote/ Number of days required: On the day of the principle survey

We will send you a quotation after investigating the installation location. Please check the contents.

04Order

04Order

Please place an order using the URL that will be sent to your email when you send the quotation or by calling our call center.
After ordering, JM will take the following actions:

  • We will decide the installation date based on your convenience.
  • Apply to the power company as follows.
    ① Application for changing contract capacity (customers who change)
    ② Grid connection application work (all customers)
  • Application for facility certification to the Bureau of Economy, Trade and Industry. (Customers who have installed solar power generation equipment)

We ask our customers to take the following actions.

  • At the same time as placing the order, please sign the Nichicon Co., Ltd.'s "Preliminary Confirmation Form" given at the time of the field survey and mail it to the company.
  • When paying for shopping credits After the approval is given, if there is a connection with the solar power generation facility, the construction will be done after the approval of the Bureau of Economy, Trade and Industry.
  • If you cancel after ordering, you will be charged separately for the main unit price and cancellation fee.

05Installation/ Time required: about 8 hours

05Installation/ Time required: about 8 hours

  • It will be installed after the approval for the grid connection application submitted to the power company has been approved.
  • After confirming the details of the field survey and signing the order form, the work will begin.
  • Application for facility certification to the Bureau of Economy, Trade and Industry. (Customers who have installed solar power generation equipment)
  • Indoor construction

    We will install a special breaker and a switchboard with a switching device, and perform work such as wiring.

  • Outdoor construction

    We will carry out work such as wall through hole construction, wiring and piping installation, and charger installation.

  • Blackout

    The work of connecting the wiring to the distribution board takes a short time, but it also involves a power failure.
    Please take measures in advance such as prevention of data loss on the PC and resetting the timer.

  • Operation check

    After connecting the communication device, check the operation of the main unit. In addition, from the viewpoint of privacy protection, the connection with the router at home is your own connection.

06Installation completed

06Installation completed

Please confirm that the power is on, and that the work you ordered and the condition after construction are the same. After explaining the handling, maintenance, and after-sales service of the charger using the "Instruction Manual", sign the "Construction completion confirmation" to complete the installation.

About procedure flow

※ 1 Please be sure to attend the decision maker
※ 2 Please declare the payment method
*3 If you do not use shopping credits, the process in 5.6 will not occur.
* 4 After confirming the estimated amount, please place an order by URL received in your email or by calling our call center.
* 5 If there is no connection with solar power generation equipment, the application will not be necessary.

Basic construction price

The basic construction price is classified into four according to the distance from the distribution board and the presence or absence of sunlight.

Premium model (VCG-666CN7)

* Prices include tax

Standard model (VCG663CN3)

* Prices include tax

About additional costs

If the following work is required as a result of the installation location survey, a fee will be charged in addition to the basic construction price.

About payment method

You can choose from three payment methods. If you have JM, you can use shopping credits.

  • Transfer
    Please transfer within 7 days to the designated account described in the invoice. The transfer fee will be borne by the customer.
  • pay by a credit card
    • Credit payments can only be made to the credit card of the person who received the installation contract.
    • The following credit cards can be used.
  • Shopping credit
    • It is available only to the person who received the installation contract. (Not under the age of 20)
    • Corporate customers are not available.
    • Please place an order after the screening of the loan company.
    • The loan is a contract with "Cedina Co., Ltd." with which we have a merchant contract.
    • Loan interest and paymentHereplease look at

Case study of installation costs (approximate)

FAQ

How do I apply for construction work?

Please apply from "Application for installation work here" at the bottom of this page.

Is it possible to apply even if it is installed in a place other than a detached house, such as a corporate office?

Is possible. Please apply from "Click here to apply for installation work" at the bottom of this page.

"EV Are there any conditions that should be considered when purchasing "Power Station"?

Please check the "pre-confirmation letter" compiled by Nichicon Co., Ltd. I will hand you at the time of the field survey.

EV I have installed a charger, can I still use the wiring?

"EV Can not be used due to differences in circuits such as power supply wiring from the Power Station.

Is it possible to connect with EcoCute?

EcoCute can not be connected due to high power consumption

Can I install in a condominium?

Decision of setting by management union is necessary. Please consult with the management union. In addition, JM is "to a condominium"EV We provide the “Installation support examination service” (for a fee) supported by the management union who will consider setting up the Power Station.
Consultation is free, so please apply from our website.https://www.matabee.com/service/phv/

Can I use the subsidy of the country / local government?

It may be useful. About subsidy of country next-generation car promotion centerhttp://www.cev-pc.or.jpPlease ask. In addition, please consult with the local government of the installation location.

After-sales service
We will receive it at the call center

JM Call Center
( EV · PH EV only)
0120-81-7048(24時間365日)

When inquiring, it is stuck in the distribution boardAfter-sales service stickerMentioned inPlease give me a 9 digit construction number
We will check the customer's installation history and respond promptly.

※ From 9 o'clock to 18 o'clock inquiries. From 18 o'clock to 9 o'clock the reception will be accepted only for after-sales service.

After-sales service sticker
Security system of security
Click here to apply for a quote

Specifications, prices, designs, and service contents are subject to change without notice.